📢 Gate廣場 #创作者活动第一期# 火熱開啓,助力 PUMP 公募上線!
Solana 爆火項目 Pump.Fun($PUMP)現已登入 Gate 平台開啓公開發售!
參與 Gate廣場創作者活動,釋放內容力量,贏取獎勵!
📅 活動時間:7月11日 18:00 - 7月15日 22:00(UTC+8)
🎁 活動總獎池:$500 USDT 等值代幣獎勵
✅ 活動一:創作廣場貼文,贏取優質內容獎勵
📅 活動時間:2025年7月12日 22:00 - 7月15日 22:00(UTC+8)
📌 參與方式:在 Gate 廣場發布與 PUMP 項目相關的原創貼文
內容不少於 100 字
必須帶上話題標籤: #创作者活动第一期# #PumpFun#
🏆 獎勵設置:
一等獎(1名):$100
二等獎(2名):$50
三等獎(10名):$10
📋 評選維度:Gate平台相關性、內容質量、互動量(點讚+評論)等綜合指標;參與認購的截圖的截圖、經驗分享優先;
✅ 活動二:發推同步傳播,贏傳播力獎勵
📌 參與方式:在 X(推特)上發布與 PUMP 項目相關內容
內容不少於 100 字
使用標籤: #PumpFun # Gate
發布後填寫登記表登記回鏈 👉 https://www.gate.com/questionnaire/6874
🏆 獎勵設置:傳播影響力前 10 名用戶,瓜分 $2
Bitcoin miner production falls in June on power curtailment, weather
Several Bitcoin mining firms reported lowered BTC production in June, mainly due to power curtailment in Texas.
Riot Platforms produced 450 Bitcoin (BTC) in the month, a 12% decline from May, when the firm mined 514 BTC, it stated in an announcement on Thursday.
Riot CEO Jason Les said the firm’s power strategy includes “economic curtailment” and voluntary participation in the Electric Reliability Council of Texas’s Four Coincident Peak (4CP) and other demand response programs
It “significantly contributes to grid stability while enhancing Riot’s competitive positioning,” he added
June marked the beginning of the ERCOT’s 4CP program, a tariff that captures demand charges in the market. It is designed to manage the periods of highest electricity demand during the months of June, July, August and September.
Large electricity consumers, such as Bitcoin miners, face transmission charges based on their usage during peak periods, so they can voluntarily curtail operations.
Riot also reported that it sold 397 BTC for $41.7 million and currently holds 19,273 Bitcoin.
Cipher Mining reported this week that it had produced 160 BTC in June, sold 58 BTC, and holds 1,063 Bitcoin
The company stated that its June production numbers were impacted by deliberate curtailment as part of their “proactive 4CP avoidance strategy.”
“This approach allowed the company to avoid costly 4CP penalties and maintain its position as having some of the lowest power costs in the industry,” it stated
Related: Bitcoin production costs up 9% on higher hashrate, energy prices
Cipher’s Black Pearl facility in Texas started contributing to production at the end of June, but the overall monthly production was reduced due to the strategic curtailment
MARA mining down 25%
MARA Holdings also reported a 25% reduction in production for June, with 211 Bitcoin mined compared to 282 the previous month. As of June 30, the company held a total of 49,940 BTC and did not sell any during the month
MARA CEO Fred Thiel said, “Following a record-breaking May, production in June came in lower, with 211 blocks won for the month.”
He blamed the decline on “reduced uptime from weather-related curtailment” and the temporary deployment of older machines in its Garden City, Texas, facility while storm-related damage was being repaired
“Natural variability in block luck — an expected dynamic when operating our own mining pool — also contributed,” he said
CleanSpark bucks the trend
Meanwhile, CleanSpark increased its Bitcoin production by 6.7% in June, surpassing its mid-year hashrate target of 20 exahashes per second (EH/s)
The firm produced 445 Bitcoin and only sold 8, bringing its total holdings to 6,591 Bitcoin as of the end of the month
Magazine: Bitcoin vs stablecoins showdown looms as GENIUS Act nears